A Word About Tariffs
Special Offers 2025
Getting Started
Getting Started
How It Works
Assembly Guides
How-To Guides
Dust Collection
Template, Bit and Guide Bearing Selection Tool
Router Selection Guide
Machine Package Selection Guide
Frequently Asked Questions
Tech Tips
PantoProjects
PantoProject Gallery
User Project Gallery
Matthew Morris Tool Cabinet
Elegant Walnut Table
John Henry's PantoRouter Cart
Lynn's PantoRouter™ Cart
Build a tray to organize your PantoRouter accessories
Krenov-Style Sawhorses
Entryway bench doubles as a dog crate
Beautiful and Durable Garden Gate
Video Library
Overview & How-to Guides
Projects
Reviews
Video Archive
Sales & Service
Support
Orders and Shipping
Returns and Refunds
International Sales
About Us & Newsletter
Contact Us
About
Media Kit
Press Releases
Recent Articles
Privacy Policy
Terms of Use
ESPAÑOL
Cómo Funciona
Acerca de la HPR
Search
Buy Now

PantoRouter

A Word About Tariffs
Special Offers 2025
Getting Started
Getting Started
How It Works
Assembly Guides
How-To Guides
Dust Collection
Template, Bit and Guide Bearing Selection Tool
Router Selection Guide
Machine Package Selection Guide
Frequently Asked Questions
Tech Tips
PantoProjects
PantoProject Gallery
User Project Gallery
Matthew Morris Tool Cabinet
Elegant Walnut Table
John Henry's PantoRouter Cart
Lynn's PantoRouter™ Cart
Build a tray to organize your PantoRouter accessories
Krenov-Style Sawhorses
Entryway bench doubles as a dog crate
Beautiful and Durable Garden Gate
Video Library
Overview & How-to Guides
Projects
Reviews
Video Archive
Sales & Service
Support
Orders and Shipping
Returns and Refunds
International Sales
About Us & Newsletter
Contact Us
About
Media Kit
Press Releases
Recent Articles
Privacy Policy
Terms of Use
ESPAÑOL
Cómo Funciona
Acerca de la HPR
Search
Buy Now
 Plunge sled and frame ready for mating.  Start by inserting one of the shafts in the linear bearings under the plunge sled. Also note that the tension springs in the pantograph have not yet been hooked up. This keeps the pantograph nice and flat.

Plunge sled and frame ready for mating.

Start by inserting one of the shafts in the linear bearings under the plunge sled. Also note that the tension springs in the pantograph have not yet been hooked up. This keeps the pantograph nice and flat.

 With the shaft in place, lift the plunge sled onto the frame. Be sure to hold the shaft while lifting the pantograph so it won't slide out. Slide the shaft forward through the front shaft holder. Slide it about 8 cm (3") beyond the shaft holder.

With the shaft in place, lift the plunge sled onto the frame. Be sure to hold the shaft while lifting the pantograph so it won't slide out. Slide the shaft forward through the front shaft holder. Slide it about 8 cm (3") beyond the shaft holder.

 Slide the rear shaft mount over to line up with the shaft and pull the shaft back into the rear shaft holder.  The screws on all shaft holders should be loose during these steps.

Slide the rear shaft mount over to line up with the shaft and pull the shaft back into the rear shaft holder.

The screws on all shaft holders should be loose during these steps.

 With the first shaft mounted on both ends, slide the second shaft into the linear bearings of the sled. It's easier if you do not try to slide it through the shaft holders at the same time.  Once the shaft is in the linear bearings, slide the front

With the first shaft mounted on both ends, slide the second shaft into the linear bearings of the sled. It's easier if you do not try to slide it through the shaft holders at the same time.

Once the shaft is in the linear bearings, slide the front shaft holder in place to line up with the shaft and push the shaft through it.

 Slide the shaft forward enough to clear the rear shaft holder, then slide the rear shaft holder to line up with the shaft, and bring he shaft back far enough to go into the rear shaft holders.

Slide the shaft forward enough to clear the rear shaft holder, then slide the rear shaft holder to line up with the shaft, and bring he shaft back far enough to go into the rear shaft holders.

 With the shaft holders still loose (able to slide side-to-side), use the table top to bring the plunge carriage parallel to the frame.

With the shaft holders still loose (able to slide side-to-side), use the table top to bring the plunge carriage parallel to the frame.

 Tighten the shaft mounts.

Tighten the shaft mounts.

 Tighten the mounting screws for the shaft holders.

Tighten the mounting screws for the shaft holders.

 Install the U-bracket for the plunge lever. You will have to detach the U-bracket from the plunge lever to do this.

Install the U-bracket for the plunge lever. You will have to detach the U-bracket from the plunge lever to do this.

 Use a screw and nut to mount the plunge lever in the U-bracket.

Use a screw and nut to mount the plunge lever in the U-bracket.

 Mount the table. The table is slid from the side. Make sure the washers go inside the channels.

Mount the table. The table is slid from the side. Make sure the washers go inside the channels.

1 2 3 4 5 6 7 8 9 10 11
Previous Next
 Plunge sled and frame ready for mating.  Start by inserting one of the shafts in the linear bearings under the plunge sled. Also note that the tension springs in the pantograph have not yet been hooked up. This keeps the pantograph nice and flat.
 With the shaft in place, lift the plunge sled onto the frame. Be sure to hold the shaft while lifting the pantograph so it won't slide out. Slide the shaft forward through the front shaft holder. Slide it about 8 cm (3") beyond the shaft holder.
 Slide the rear shaft mount over to line up with the shaft and pull the shaft back into the rear shaft holder.  The screws on all shaft holders should be loose during these steps.
 With the first shaft mounted on both ends, slide the second shaft into the linear bearings of the sled. It's easier if you do not try to slide it through the shaft holders at the same time.  Once the shaft is in the linear bearings, slide the front
 Slide the shaft forward enough to clear the rear shaft holder, then slide the rear shaft holder to line up with the shaft, and bring he shaft back far enough to go into the rear shaft holders.
 With the shaft holders still loose (able to slide side-to-side), use the table top to bring the plunge carriage parallel to the frame.
 Tighten the shaft mounts.
 Tighten the mounting screws for the shaft holders.
 Install the U-bracket for the plunge lever. You will have to detach the U-bracket from the plunge lever to do this.
 Use a screw and nut to mount the plunge lever in the U-bracket.
 Mount the table. The table is slid from the side. Make sure the washers go inside the channels.

PantoRouter

Distributor for the Americas
Portland, Oregon

p. (877) 333-7150
e. info@pantorouter.com

Shop
Getting Started
PantoProjects
Videos & Tutorials
Sales & Service
About Us
Privacy Policy

Spanish

Cómo Funciona
Acerca de la HPR

 

Newsletter Sign-up

Back to Top
WoodCraft Solutions LLC, Portland, OR, USA(877) 333-7150Info@PantoRouter.com

©PantoRouter